© 2024 Decent Engineering International. Designed By TechRiot IT
Matarbari Ultra Super Critical Coal-Fired Power Plant Project
Description
Our Scope of Works: …………………………………………………………………………..
● CEMS System Installation work in 275metter Chimney at Matarbari Site, (Installation Chimney inside G.I Conduit, Cable Tray Signal Cable, Power Cable &
Various Instrument works.)
● Supply Hot Dip Galvanized Cable Tray, Cable ladder & Accessories
● Supply Hot Dip Galvanized Steel metal Greeting
● Supply of Various Construction Materials Item.
Project Description
Client: Techlink Onshore Ltd (Malaysia) Contractor: Decent Engineering International.
Release Date:
11/26/2019
Client:
Techlink Onshore Ltd (Malaysia)
Category:
Author:
Decent Engineering International